CASE STUDY: Light Gauge Steel Framing from SBS Group Helps Reduce Build Time on a Tight Site
CASE STUDY: Light Gauge Steel Framing from SBS Group Helps Reduce Build Time on a Tight Site
How did Cortek by SBS Group’s use of framing made from TRUECORE® steel achieve a saving of 4-6 weeks on the structural element alone for the 3 level Pleasant Road apartment project? Find out in the case study below:
Summing up the project, Stephen Compton from Liberty Builders said
The beauty of working with frames made from TRUECORE® steel is they’re quick, straight, light and generate less onsite mess; we saved 4-6 weeks on the structural element alone.”
Caleb Grimshaw of SBS Group said:
We believe that to build faster and easier, we have to be smart about the way we design our framing systems. That’s why we use the analogy of designing with the nail bag on. We approach each project as if we were the builder searching for time, labour and cost savings.”
Read more case studies, or contact our team to discuss the savings of making the switch to steel for your next project: call 1300 782 950 or email sales@cortekframing.com.au.