Project Overview
THE PROJECT CHALLENGE /
Develop a faster and easier to install system for the top level structure while still complying with the required building regulations.
THE CORTEK FRAMING STEEL SOLUTION /
The lightweight alternative replaced substantial structural steel and was engineered to support the roof plan platform.>
Fire rating allowances were accommodated within the Cortek framing design process, satisfying the FRL (fire resistant level) in accordance with AS 1530.
Using the latest BIM modelling 3D technology, framing was detailed and fabricated to millimetre perfect accuracy.
Cortek facilitated an on-site coordination meeting with the installer, site manager and project manager to ensure an efficient and streamlined install.
The speed of erection was a key advantage of using steel, eliminating unnecessary fixings/brackets with no further straightening required once frames were installed.