Project Overview
THE PROJECT CHALLENGE /
Partner with the builder to supply a framing system that would require minimal maintenance for the infill walls.
THE CORTEK FRAMING STEEL SOLUTION /
Steel is termite-proof and doesn’t twist, warp or shrink over time, resulting in little to no maintenance – which is why it is the preferred material of choice in the educational department.
The frames were detailed and fabricated here in Australia using TRUECORE® steel. The Cortek project coordination team worked closely with the builder to ensure a successful install.
In the words of the builder:
I believe the quality of the product is what differentiates it from timber. Once shop drawings were approved, the install process was fast compared to timber and very easy.
In the words of the installer:
Another great project with SBS. Always a pleasure working with someone who delivers such a professional and reliable service. The product is second to none and their carefully considered detailing means the installation process is efficient and hassle free.
Images supplied by our friends at Bolt Blue Constructions.