Project Overview
Project
Malvina Street Townhouses
Builder
Rays Enteprises
Architect
Design CAD Services
Location
Burwood, Victoria
THE PROJECT CHALLENGE /
The builder needed to speed up the project schedule, so light gauge steel framing was identified as the fastest system to install.
THE CORTEK FRAMING STEEL SOLUTION /
Wall, joist and roof truss frames were easily fixed off using supplied layouts. Avoiding the on site stick building approach reduces labour costs.
Frames were fabricated using Bluescope’s TRUECORE® steel for lightweight, yet strong, consistent and true results – no further straightening of walls once installed.
In the builder’s own words:
A controlled prefab system; quick, strong, easy fixing and accurate with straight, plumb and level walls.