Project Overview

Project Malvina Street Townhouses
Builder Rays Enteprises
Architect Design CAD Services
Location Burwood, Victoria

THE PROJECT CHALLENGE / The builder needed to speed up the project schedule, so light gauge steel framing was identified as the fastest system to install.

THE CORTEK FRAMING STEEL SOLUTION /

> Wall, joist and roof truss frames were easily fixed off using supplied layouts. Avoiding an on site stick building approach reduces labour costs.

> Frames were fabricated using Bluescope’s TRUECORE® steel for lightweight, yet strong, consistent and true results – no further straightening of walls once installed.

In the builder’s own words: “A controlled prefab system; quick, strong, easy fixing and accurate with straight, plumb and level walls.”