Project Overview
THE PROJECT CHALLENGE /
Reduce structural steel and save time on site for the top level structures of the apartment and townhouse buildings.
THE CORTEK FRAMING STEEL SOLUTION /
The Cortek Framing by SBS Group worked closely with the construction teams, presenting feasible and practical solutions to support many design challenges.
Hip roof trusses were designed and engineered to span over 12m at very low roof pitch to achieve the architectural intention for the oversized penthouses, including the load on internal mechanical services. The challenging suspended facade was successfully detailed and engineered by our in-house design team, facilitating easier installation.
With staged deliveries, the installers were able to efficiently erect the steel frames in line with the construction program.