Project Overview
THE PROJECT CHALLENGE /
The builder was seeking to replace heavy and time-consuming structural steel and traditional timber materials with a light gauge steel framing solution.
THE CORTEK STEEL FRAMING SOLUTION /
Following initial design meetings, Cortek Framing by SBS Group was awarded the contract to pre-fabricate a Smart Frame solution for the top level wall and roof trusses with all shop drawings and frame layout plans completed in house.
Engineering including 1507 certification was also coordinated for both the loadbearing and non-loadbearing frames.
Framing was fabricated using light gauge Truecore steel, true and straight to suit the building requirements. Once on site, frames were simply lifted and installed in sections.
Balustrade and planter box framing was also designed and manufactured off site for smarter, easier and faster install.