Project Overview
THE PROJECT CHALLENGE /
Alleviate cost and program restraints by guaranteeing a seamless installation process for the top level framing structure.
THE CORTEK FRAMING STEEL SOLUTION /
Through the tender process, Cortek and Figurehead worked together to identify any areas of concern and ensured they were correctly designed.
3D modelling and consultant workshops with Cortek’s engineering department assisted in identifying and mitigating any risks of interfacing lightweight steel with adjoining building components.
Over the full shop drawing, fabrication and installation process, we saved roughly 2 weeks on our construction target dates.
The use of the steel framing system also had positive cost implications, with the supply and installation providing beneficial savings.