Project Overview
Project
Pine Ave Townhouses
Builder
Coben Constructions
Architect
Cera Stribley
Location
Elwood, Melbourne
THE PROJECT CHALLENGE /
Build a three-storey townhouse development from the ground up, comply with the design criteria while using minimal structural steel and deliver on time and on budget.
THE CORTEK FRAMING STEEL SOLUTION /
Over 80% of the original structural steel was removed through redesigning with the Cortek Framing system.
The ability to provide a complete framing package with full detailing and engineering ensured no gaps in the design process.
The townhouses were individually braced to achieve the required fire rating and curved walls were integrated to support floor joists.
Straight, true and accurate frames were made from lightweight TRUECORE® steel for a fast and easy install.