Project Overview

Project Pine Ave Townhouses
Builder Coben Constructions
Architect Cera Stribley
Location Elwood, Melbourne

THE PROJECT CHALLENGE /
Build a three-storey townhouse development from the ground up, comply with the design criteria while using minimal structural steel and deliver on time and on budget.

THE CORTEK FRAMING STEEL SOLUTION /

>  Over 80% of the original structural steel was removed through redesigning with the Cortek Framing system.

> The ability to provide a complete framing package with full detailing and engineering ensured no gaps in the design process.

> The townhouses were individually braced to achieve the required fire rating and curved walls integrated to support floor joists.

>  Straight, true and accurate frames were made from lightweight TRUECORE® steel for a fast and easy install.