Project Overview
THE PROJECT CHALLENGE /
Part of Seaford Park Primary School’s upgrade was constructing a permanent building to replace existing relocatable structures.
THE CORTEK FRAMING STEEL SOLUTION /
The use of timber materials to build the walls was originally documented, however, with on site construction methods becoming less productive and more time-consuming, a prefabricated steel framing system was adopted as a smarter alternative.
Full shop detailing, framing layouts and engineering were coordinated by Cortek’s in house design team. All openings for doors and the straight and circular windows were detailed as part of the framework.
Using BHP Truecore light gauge steel, walls were constructed straight and true as sections for easy man-handling on site.
Walls were installed without requiring any straightening, speeding up the installation process