The Kingston Central Park Apartments

Project Overview

Project The Kingston Central Park Apartments
Builder Samssons Projects
Architect C. Kairouz Architects
Location Malvern East, Victoria

THE PROJECT CHALLENGE /

The builder was looking for prefabricated framing alternatives for the balustrade, feature boxes and fins achieved multiple smarts.

THE CORTEK FRAMING STEEL SOLUTION /

> The combined Cortek Smart Frame system incorporated the front balustrade and box feature for ease of installation. For structural fixings back to the building, brackets and cleat systems were designed with diagonal bracing to increase and strengthen structural integrity.

> Fully customised to the building requirements, the Smart Frame system included in house detailing and framing layouts with full engineering.

> Framing was fabricated using light gauge steel in a controlled factory environment before being transported to site for simple and efficient installation.

> When structural steel is replaced with a superior lightweight alternative, there are significant savings involved for the builder.