Project Overview

Project Warrigal Road Day Care Centre
Builder Cardo Constructions
Architect T3 Architecture
Location Ashburton, Vic

THE PROJECT CHALLENGE / Develop an alternative framing system to reduce structural steel and save time on install.

THE CORTEK FRAMING STEEL SOLUTION /

> The light gauge steel framing system was fully engineered to achieve the required design and structural properties, removing unnecessary and costly structural steel.

> Frames were fabricated using 3D CAD integrated machinery for straight, true and accurate results, resulting in faster erection.

> As a result of the efficiencies in the install process, the project was completed approximately 2 months ahead of expected deadlines.

> In the words of the builder: ‘Blue is the future.’