THE PROJECT /

Following a successful partnership for Chadstone Shopping Centre’s Stage 33 refurbishment, the builder recommended a lightweight bulkhead framing system for the Stage 40 upgrade. The project required complex curved and straight bulkheads, with integrated services that needed to be both strong and easy to install.

THE CORTEK STEEL FRAMING SOLUTION /

Cortek supplied pre-fabricated framing systems engineered for superior cantilever load capacity, replacing the specified structural steel.

Frames were curved in multiple directions and designed for direct plasterboard fixing, eliminating on-site cutting and waste. Delivered ready to install with a flexible joining system, the frames enabled faster installation and reduced scaffolding costs.

In the plastering contractor’s own words:

Thanks for your efforts at Chadstone Shopping Centre. Your team were a great help with constant changes to design and program…they were professional and maintained an ever evolving manufacturing and delivery schedule.

Image credits: IMAGEPLAY