THE PROJECT /
M-City Monash is a $1 billion mixed-use development located in Clayton, Victoria – one of the largest master-planned, single-stage projects ever undertaken in Victoria.
The scale and complexity of M-City demanded precision at every stage of construction. Among the many intricate architectural elements across the retail area of the development were bulkheads, skylight voids and a range of custom features that required both design accuracy and an efficient, repeatable installation process across the entire site.
THE CORTEK STEEL FRAMING SOLUTION /
Cortek partnered with the plastering team to engineer and pre-fabricate custom architectural bulkhead frames off-site. By getting involved early and resolving design details before they reached site, Cortek removed potential delays for a fast and controlled fit-out process.
The lightweight steel framing system was chosen for its ease of installation, dimensional accuracy and consistent quality – delivering labour and time efficiencies on site at a scale where those savings really count. Off-site fabrication reduced the risk of on-site errors and gave the client confidence that every component would go up exactly as intended.
In the words of the client:
Cortek made things simple. Great product, easy to work with and Cortek are great to deal with. Saved 2 weeks on site install.
Paul G – Arc Plastering

