THE PROJECT /

Supply, engineer, design and shop detail the internal ceiling framework over 7 levels in the largest Myer store in Victoria.

THE CORTEK STEEL FRAMING SOLUTION /

Cortek engineered and pre-fabricated the entire framework, helping the builder achieve the tight program on a very difficult site application.

The seventh level was the most challenging as it involved a three-dimensional raked coffered ceiling. The talented team of designers at Cortek were able to quickly overcome all the design challenges to produce the impressive feature ceilings you see today.