THE PROJECT CHALLENGE / 

A simple, fast and accurate solution was required to achieve the unique yet challenging 3D architectural features, while adhering to the tight construction program for the Penguin Parade Visitor Centre project.

THE CORTEK FRAMING STEEL SOLUTION /

With speed and precision critical to the project’s success, customised pre-fabricated framing solutions were implemented to reduce on-site labour and installation time compared to traditional stick-build methods.

Frames were detailed in-house, 3D modelled, and fabricated to millimetre-accurate tolerances, simplifying the installation of the irregular geometry, and enabling linings to be fixed directly to the framing members, including at valleys and junction points.

Manufactured from high-strength, lightweight steel, the frames improved handling efficiency and reduced on-site risk and exposure without compromising structural performance.

Detailed set-out plans were also provided to ensure each module could be installed accurately and efficiently in its designated location on site.

As the Penguin Parade operates nightly, construction works were carefully coordinated to allow the existing facility to remain open to more than 3,000 visitors each evening.