THE PROJECT /

The $200+ million development of RMIT University’s Swanston Academic Building (SAB) is a landmark 12-level facility wrapping around the historic Oxford Scholar Hotel on Swanston Street.

The project presented major challenges across multiple internal ceiling and wall features, with extensive scaffolding and access requirements driving up costs and slowing progress. Its highly complex, bespoke design – featuring numerous shards and sharp angles – made coordination across trades extremely difficult.

Cost and accuracy were also critical concerns. Traditional methods were estimated to be three to four times more expensive, with inefficiencies driven by the lack of shop drawings and time-consuming on-site cutting. For a high-profile project with a precise, architecturally striking finish, there was no room for error – making a controlled, pre-fabricated steel framing approach the clear solution.

THE CORTEK STEEL FRAMING SOLUTION /

Cortek collaborated closely with plastering contractors to design and fabricate specialised pre-fabricated framing modules tailored to the project’s complex wall and ceiling geometries. These lightweight modules were easy to handle and install without heavy cranes, creating a faster, safer and more efficient process for all trades on site.

The benefits were clear across cost, quality and time. Using light gauge steel in place of structural steel reduced material costs, while pre-engineered modules enabled direct fixing of cladding and eliminated time-consuming on-site adjustments. With full 3D modelling and shop drawings provided by Cortek, materials were pre-cut with precision, ensuring a high-quality finish. Overall, the pre-fabricated approach reduced installation time by up to 50–60%.

Cortek’s performance on the project reinforced its position as a trusted partner, leading to repeat work with architects, builders and contractors. By improving coordination and reducing high-risk on-site work, Cortek delivered greater cost certainty – turning what was a potential financial risk into a controlled, profitable outcome for the construction teams.