THE PROJECT CHALLENGE /

Design and deliver a pre-fabricated steel structure to form the Church’s feature bell tower.

THE CORTEK STEEL FRAMING SOLUTION /

The team at Cortek shop detailed and pre-fabricated this multi-stepped bell tower frame, incorporating the dome roof using lightweight high tensile steel.

With lifting points in each corner, the installation was made easy for the contractors on site – the tower framing was pre-clad, lifted into position and fixed off to the building structure.