THE PROJECT /
A globally designed, three-storey internal sculpture needed to be built within the heritage-listed Faculty of Architecture — an ambitious design that was difficult to cost, engineer and construct. Balancing the international architectural vision with on-site constraints made the project highly complex for both the builder and contractors.
THE CORTEK STEEL FRAMING SOLUTION /

