THE PROJECT /

A globally designed, three-storey internal sculpture needed to be built within the heritage-listed Faculty of Architecture — an ambitious design that was difficult to cost, engineer and construct. Balancing the international architectural vision with on-site constraints made the project highly complex for both the builder and contractors.

THE CORTEK STEEL FRAMING SOLUTION /

Cortek developed a three-dimensional pre-fabricated lightweight framing system; consulting early, creating prototypes, completing shop drawings and coordinating closely with the relevant teams.

The structure was fabricated off-site in custom specialised sections, delivering a simplified framing solution that was ready for immediate install and direct fixing of internal linings.