Balwyn T Apartments – another builder choosing to use steel instead of a traditional timber system for top level construction.

Using a pre-fabricated light gauge steel system, a lot of the initial design ground work was completed before the frames even arrived on site. Installation was therefore streamlined and quick with positive flow-on effects to the following trades.